Construction of 6 Wet crude oil treatment tanks project in Al-Jumbour North, Kirkuk Governorate
The Construction of 6 wet oil treatment tanks project in Al-Jumbour North, Kirkuk Governorate, represents a vital step towards enhancing the region's oil infrastructure. These tanks, strategically located in Al-Jumbour North, Kirkuk Governorate, will play a crucial role in efficiently processing and storing crude oil, contributing to the region's economic growth and stability. This project underscores our commitment to bolstering energy infrastructure and fostering sustainable development in Kirkuk Governorate, ensuring a reliable supply of oil resources while adhering to stringent safety and environmental standards.
Establishment of valve complex No. (1, 2, 3) with the main complex and mechanical connections at Jambour North Station
The Construction of Valve Complex (1-2-3) with Main Complex is a pivotal project aimed at establishing a comprehensive infrastructure system. This initiative involves the development of a sophisticated network of valves and associated facilities, denoted by the designations 1, 2, and 3. Integrated with the main complex, this infrastructure serves as a crucial component for managing and controlling the flow of resources efficiently. By orchestrating the construction of these interconnected complexes, we aim to enhance operational effectiveness, ensure system reliability, and optimize resource utilization within the designated area.
Construction new manifold at Khoubaz Station
Construction of an oil tank with a capacity of (2222) cubic Metres at the Sarlo gas isolation station
The construction project involves establishing Complexes 1 and 2 alongside the Main Complex while integrating them with existing infrastructure, including the old complex, Test Line, and Banks A and B. This initiative aims to enhance operational efficiency and streamline resource management within the designated area. By connecting the new complexes with the pre-existing facilities, we ensure seamless coordination and maximize the utilization of resources, thereby contributing to the overall advancement and sustainability of the infrastructure network.
Connecting three-phase insulators at the northern Bai Hassan station
The construction project involves establishing Complexes 1 and 2 alongside the Main Complex while integrating them with existing infrastructure, including the old complex, Test Line, and Banks A and B. This initiative aims to enhance operational efficiency and streamline resource management within the designated area. By connecting the new complexes with the pre-existing facilities, we ensure seamless coordination and maximize the utilization of resources, thereby contributing to the overall advancement and sustainability of the infrastructure network.